Checklist for Construction Plans
PROJECT NAME:________________________________________________________ ID#___________________
Note: This checklist is provided for the convenience of design firms, so that the most common errors and
omissions may be avoided. Refer to Loudoun Water's Engineering Design Manual for complete discussion
of design requirements and parameters. PLEASE DO NOT INCLUDE THIS FORM WITH YOUR APPLI
DATES: 1st Sub._____________________ 2nd Sub. _____________________ 3rd Sub. ___________________
Cover Sheet and General 1st sub. 2nd sub.
Loudoun Water Project ID Blank
Engineer's Seal, Signiture and Date
Accurate Sheet Index
Loudoun Water revision block, every applicable sheet
Standard Notes (G-5 within the Standard Details) fully legible
All and only applicable series from the Standard Details included in plan set
Standard Details provided are current
Design follows applicable basis of design, preliminary plat, and/or master plans
Facilities sized correctly
Adjoining work by other plans shown and up to date; plan names referenced
Existing conditions and utilities shown
Coordinate system and vertical datum identified
CAD files for use in Loudoun Water GIS Required Not Required
Bond Estimate May Omit Required
Plan View - General 1st sub. 2nd sub.
North arrow and minimum three grid tics per sheet
Adequate separation between water and sanitary sewer, and with other utilities
Pipes a minimum 15' from buildings
Service connection for each building (water and sewer)
Easements shown for utilities outside of public right of way
Easements unencumbered and accessable for traverse
Landscaping outside of Loudoun Water easements
Limits of pre-blast clearly specified, where appropriate
Access to utilities provided to adjoining properties
Profile - General 1st sub. 2nd sub.
Utility crossings shown with accurate clearances specified
Profiles of existing utilities provided if impacted by proposed grading
Engineering Design Manual, Appendix A
Checklist for Construction Plans Page 1 of 6
October 2016
Water - Plan View 1st sub. 2nd sub.
Min. 300' radius for pipe 12" and smaller, bends required otherwise
Min. 500' radius for pipe 16" and larger, bends required otherwise
Bends shown at accurate angles ± 3°
Separation from sewer, curb, drains, and structures
Dead-end line less than 500' for 8" and larger, 300' for 6"
Adequate hydrant coverage to all structures
All permanent terminations by means of a hydrant
Air release valves specified at significant high points of 16" and larger pipes
Hydrants at appropriate spacing and at substantial high and low points
Line anchor and blow-off valve provided where future extension needed
Valve between service connection and blow-off valve in temporary terminus
Valving at appropriate intervals and configurations
Fire hydrant min. 50' from commercial/industrial building
Fire hydrant is maximum 100' from siamese connection
Fire service independent with anchored branch valve (6" min.) at main
Meter crocks 5' from driveway apron and fire hydrants
Load letter and meter sizing; coordinate plumbing concerns
Water - Profile 1st sub. 2nd sub.
Proper cover specified (based on diameter) and minimized as practical
All fittings, valves and hydrants called out and stationed
Vertical curvature within limits of joint deflection (based on diameter)
16" and larger pipes have air release valves at substantial high points
Hydrants at substantial low points
Controlled fill specified where pipe is above existing grade
Engineering Design Manual, Appendix A
Checklist for Construction Plans Page 2 of 6
October 2016
Sewer - Plan View 1st sub. 2nd sub.
Manhole placement conforms to street design; manholes minimized
Manholes provided where future extensions are anticipated
Minimum 90° between incoming and outgoing pipes at manhole
Within maximum length between manholes (based on diameter)
Adequate angle to provide separation between pipe penetrations at manhole
System extends beyond waterline improvements
Pre-blast for future extension from manhole; show possible future bearings
No doghouse manholes; must be cut in
Sewer - Profile 1st sub. 2nd sub.
All invert information shown on maholes, including laterals entering manhole
Invert elevation of existing sewer based on field survey
Length, slope, and diameter of sewer shown, accurate, matching plan view
Minimum slopes provided (based on diameter)
Twice minimum slope on permanent terminal run
Cover on pipe is within standards
Adeqaute protection provided for stream crossings
Drop across manholes: 0.2' desired; 0.1' minimum; pipe crowns match or better
Maximum invert difference at manhole is 0.5'
Ensure that future extensions can cross adjacent stream
Top of manhole is 1' above grade if beyond right of way and developed lawns
Water-tight cover specified if manhole is below 100-year storm elevation
Vents provided where necessary.
Specify heavy duty frame and cover where manhole is in future pavement
Lining of manholes specified where appropriate
Specify type of pipe for existing and proposed sewers
Diameter of manholes specified if larger than 48"
Sanitary Laterals 1st sub. 2nd sub
Laterals enter sewer at 90°
Laterals end one foot beyond Common Shared Easement (CSE)
Profile or table provided
Minimum riser height three feet
Invert information correct, including laterals entering manhole
Stations and lengths match plan view
Risers start out of right of way and end a minimum 5' from end of lateral
Lowest floor elevation in each building listed
Clean out added for laterals more than 100'
Commercial/industrial - clean out 5' from building wall
Pretreatment devices specified where applicable
Engineering Design Manual, Appendix A
Checklist for Construction Plans Page 3 of 6
October 2016
Checklist for Construction Plans
PROJECT NAME:________________________________________________________ ID#___________________
Note: This checklist is provided for the convenience of design firms, so that the most common errors and
omissions may be avoided. Refer to Loudoun Water's Engineering Design Manual for complete discussion
of design requirements and parameters. PLEASE DO NOT INCLUDE THIS FORM WITH YOUR APPLI
DATES: 1st Sub._____________________ 2nd Sub. _____________________ 3rd Sub. ___________________
3rd sub.
Not Required
Required
3rd sub.
3rd sub.
Engineering Design Manual, Appendix A
Checklist for Construction Plans Page 4 of 6
October 2016