Module 7.5 –Office Building Design, Construction and Management 2
Environmental impacts
Key choices about building design to reduce impacts
Construction:
• Construction products (recycled
materials such as aggregates
from construction and
demolition waste)
• Transportation of aggregates to Construction and use of
production sites by rail or buildings in the EU:
• Uses approx. half of all
shipping materials extracted
• Environmental management of • Consumes 40% of energy
construction and demolition • Consumes 1/3 of water
• Generates 1/3 of all waste
waste
Module 7.5 –Office Building Design, Construction and Management 3
Environmental impacts
Key choices about building design to reduce impacts (cont.)
Use:
• Energy performance during
occupation (lighting, heating,
cooling and ventilation)
• Lifespan of the building and its
elements (service life):
- adaptation of building and its
structure at the end of service
life
- healthy and attractive working
environment (good indoor air
quality , natural light, etc.)
Module 7.5 –Office Building Design, Construction and Management 4
Environmental impacts
Key choices about building design to reduce impacts (cont.)
Use (cont.):
• Nature-based solutions
(green roofs and walls,
habitats in courtyards and
patios, sustainable urban
drainage systems, street
trees)
Module 7.5 –Office Building Design, Construction and Management 5
Scope
What is included in the EU GPP Criteria
• Renovation of existing
buildings and construction of
new office buildings: design, site
preparation, construction, servicing
and ongoing management