320x Filetype PPT File size 0.55 MB Source: www.pointofcare.net
Outline
Compliance improvement with connectivity
Quality management program for unit use
devices
Continuous glucose monitors: pre-
analytical, analytical and post-analytical
factors
Plastic capillary tubes
Operator Lockout Monitored for Three Random
Units
s10 8 8
r 8
e
f s
o U
6 5
r d
e e 4
b z 3
i 4
m r 2
u o
N h 1
t 2
u 0 0 0 0 0
a
n 0
U
May June July October*
Month
5 North 6 East 9 North
*Post RALS Plus implementation with the operator lockout
feature.
Unauthorized operators on all 61 nursing
units before and after connectivity: Costs
Before After
Expenses Connectivity Connectivity
POCT time spent on creating 36 hrs 0 hrs
and issuing reports/3 mos
Nursing time spent 4.5 hrs 0 hrs
responding to reports/3 mos
TOTAL unauthorized $847.80 $0.00
operators associated labor
cost/3 mos
Quality control failures: Costs
Before After
POCT Cost Connectivity Connectivity
Time spent
troubleshooting/ 3 3 hrs 15 min
mos
TOTAL
troubleshooting labor $58.53 $4.88
cost/3 mos
Reduction in labor costs after interface of
the Inform with the LIS: 3 month period
Expenses Before After
Connectivity Connectivity
Manual result LIS entry:
Average time/single result 1 min 0
Average number results/3 mos 84,858 84,858
Labor cost $32,627.90 $0.00
Performing manual audits:
Time required/3 mos 24 hrs 0
Labor cost $468.24 $0.00
TOTAL labor costs related to
manual result entry and audits $33,096.14 $0.00
no reviews yet
Please Login to review.