2013Means
Integrator Guide
ForSageEstimating 9.8 and 12.1
NOTICE
This is apublicationof SageSoftware, Inc.
DocumentNumber20003048050198001/2013
©2013SageSoftware,Inc.Allrightsreserved.Sage,theSagelogosandtheSageproductandservice
namesmentionedhereinareregisteredtrademarksortrademarksofSageSoftware,Inc.,oritsaffiliated
entities. All other trademarks aretheproperty of theirrespectiveowners.
® ®, ®
BusinessObjects andtheBusinessObjectslogo,BusinessObjects andCrystalReports are
trademarks orregisteredtrademarks of Business Objects SoftwareLtd. intheUnitedStates andinother
countries. Business Objects is anSAP company
® ® ®
Microsoft SQLServer ,WindowsVista andtheWindowslogoaretrademarksorregisteredtrademarks
of Microsoft CorporationintheUnitedStates and/orothercountries.
YouruseofthisdocumentandtheSageproduct(s)describedhereinisgovernedbythetermsand
conditions of theSageEndUserLicenseAgreement(“EULA”)orotheragreementthatisprovidedwithor
includedintheSageproduct. Nothinginthis document supplements, modifies oramends thoseterms and
conditions. Except as expressly statedinthoseterms andconditions, theinformationinthis document is
providedby Sage“ASIS”andSagedisclaimsallexpress,impliedorstatutory warranties of any kind,
includingbut not limitedtothewarranties of merchantability, fitness foraparticularpurposeorof non-
infringement. Noimpliedlicenseis grantedtoyouunderany Sageintellectualproperty ortradesecret right.
Sagereservestheright torevise, supplement orremoveinformationinthis document at any timewithout
noticetoyouorothers.
Release Guide
2013 Means Release
RSMeanshasupdateditsdatabasesforthe2013release.IfyouuseRSMeansdatabaseitemsinyour
estimates, readthis guidetoreview thechanges andtheinstructions forupdatingthefollowingaffected
databases:
n MeansDatabases
n ConstructionKnowledgebase
n Residential Knowledgebase
NewinThisRelease
RSMeansdatabaseshavebeenupdatedwithcurrentpricinginformation.
MasterFormat 2012 Format
RSMeanshasadoptedtheConstructionSpecificationsInstitute(CSI)MasterFormat2012(MF12)data
structureforall of theirdatabases. Previously, RSMeans databases usedtheMasterFormat 2004(MF04)
ortheMasterFormat1995(MF95)datastructure.
IMPORTANT:
n If youarealready usingRSMeans databases intheMF04format, youdonotneedtoupgradeyour
databases totheMF12format.
n YoumustupgradetoSageEstimatingproductsversion9.8orlaterbeforeyouinstallthe2013Means
Integrator.
Overview
TheRSMeansdatabasescorrespondtotheRSMeansCostDatabooksyoureceivewithyourshipment.
WithSageEstimatingMeansIntegrator,youcancreateasingledatabaseorcombinemultipledatabases
intoonecompositedatabase.Alternatively, youcanupdatethepricingonanexistingRSMeansdatabase
withcurrent RSMeanspricing.
1 Install Estimating9.8orlater.
2 Insert the2013MeansIntegratorinstallationCD intotheCD driveof theworkstationorserverwhere
SageEstimating9.8or12.1isinstalled.
Fromtheinstallationbrowser:
2013MeansReleaseGuide Page 1
ReleaseGuide
a Select toinstall theMeans IntegratorapplicationforSageTimberlineOffice9.8or12.1.
b Click [Browse] andbrowsetotheserverorworkstationwhereyouwanttostoreyourRSMeans
databases.
c Select thecheck box next toeachRSMeansdatabaseyouwanttoinstallthenclick[Install].
3 Start the2013MeansIntegratorby clickingthefollowing:
p For Sage Estimating 9.8:Start > AllPrograms > SageSoftware>SageTimberlineOffice>
Estimating>MeansIntegrator.
p For Sage Estimating 12.1:Start > AllPrograms > Sage> Sage300ConstructionandRealEstate
> Estimating> Means Integrator.
4 Follow thesteps throughtheMeans Integratorwizard.
2013 Means Integrator Workflows
Integratingyour2013RSMeansdataisafivestepprocess.
Step One: Prepare Database
IntheMeansIntegratorwizardPrepare Databasewindow,youcanselectwhethertotransferdataor
updatedata. Thefollowinginformationdescribes theseoptions.
Transfer Data
Select Transfer Dataif youareready totransferRSMeans 2013datatoanew databaseortoanexisting
databasewithwhichyouhavealreadybeenworking.
n Transfer Data—New Database
Select this optiontocreateanew Estimatingdatabaseandpopulateit withallof theRSMeans 2013
items intheMF12format.
n Transfer Data—Existing Means MF12 Database
If youselect totransfertoanexistingMF12database, theIntegratorwilltransferany new RSMeans
2013itemstoyourdatabase.
n Transfer Data—Non-MeansDatabase
If youselect tointegratewithanon-RSMeans database, theIntegratorwilltransfertheRSMeans 2013
items toyourexistingdatabase. Theresultingdatabasewillcontainbothyourexistingphases anditems
andtheRSMeansphasesanditems.
NOTE: AddingRSMeans2013phasesanditemscouldcauseyourphasesorttoappeardifferently
inEstimating.
If youaretransferringRSMeans datatoanew database, alsoselect acompany toassociatewiththedata
thenspecify thelengthof thenormalwork periods, theJobCost programyouwant toassociatewiththe
database(if desired), andthedefault crew pricingmethod.
2013MeansReleaseGuide Page 2