EPORT ON
R
SITE MANAGEMENT PLAN
TEXTILEATHER
3729 TWINING STREET
TOLEDO, OHIO
BY
Haley & Aldrich, Inc.
Cleveland, Ohio
FOR
City of Toledo
Toledo, Ohio
File No. 36005
15 May 2015
15 May 2015
File No. 36005
City of Toledo
One Government Center, Suite 2250
Toledo, Ohio 43604
Attention: Bill Burkett
Subject: Site Management Plan
3729 Twining Street
Toledo, Ohio
Dear Mr. Burkett:
Haley & Aldrich, Inc. (Haley & Aldrich) prepared this Site Management Plan (SMP) on behalf of
the City
te), located in Toledo, Ohio.
of Toledo for the Textileather Facility (the Si
This Site Management Plan (SMP) documents the overall measures required to maintain protection of
human health and the environment at the Site consistent with the requirements of the Order of Consent
is plan specifies the general methods necessary to ensure
RCRA‐05‐2015‐0004 and the CA725. Th
compliance with the engineering controls (ECs) required to prevent and/or control human exposure to
Site contaminants. Compliance with this plan is required until such a time as site remedies/corrective
e that this
measures have been complete and a Site Management Plan is no longer necessary. Please not
plan and its attachments are not intended to serve as an investigation or construction specific Health
and Safety Plan (HASP) for the Site. Any activities that would expose people/workers on the Site to
contaminants of concern will require such plans prepared consistent with this SMP.
t the undersigned with any questions you may have.
Please contac
Sincerely yours,
HALEY & ALDRICH, INC.
David Veinot David J. Hagen
Project Manager Vice President
Enclosures
G:\Projects\36005 Textileather\024 ‐ Corrective Measures Work Plan\2015 Textileather Site Management Plan\2015_0515_HAI_Site Managment Plan_F.docx
TABLE OF CONTENTS
Page
List of Tables iii
List of Figures iii
1. Introduction 4
1.1 BACKGROUND 4
1.2 SITE HISTORY 4
1.3 SITE MANAGEMENT REQUIREMENTS 4
1.4 SITE MANAGEMENT PLAN 5
2. Excavation Management 6
2.1 EXCAVATION PERMITTING 6
2.2 CONTAMINATION PRESENT IN THE SUBSURFACE 6
2.3 EXCAVATION REQUIREMENTS 6
2.3.1 Air Monitoring and Vapor Management 7
2.3.2 Soil Screening Methods 7
2.3.3 Soil Stockpiling 8
2.3.4 Excavation Soil Characterization 8
2.3.5 Materials Disposal Off‐Site 9
2.3.6 Underground Utilities 9
2.3.7 Fluids Management 9
2.3.8 Cover Restoration 9
2.3.9 Backfill from Off‐Site Sources 10
2.3.10 Stormwater Pollution Prevention 10
2.3.11 Excavation Contingency Plan 10
2.3.12 Other Nuisances 10
3. Sewer Maintenance 11
4. Calender Basement Maintenance 11
4.1 HEALTH AND SAFETY PRECAUTIONS 11
5. PZ‐31 NAPL Monitoring 11
Tables
Figures
Appendix A – Site HASP
List of Tables
Table No. Title
I Parameter List, Analytical Methods, and Target Quantitation Limits
List of Figures
Figure No. Title
1 Site Locus
2 Site AOIs
iii