BILL OF QUANTITIES
Gabion wall construction for protection of TLC in different districts and locations
Page 1 of 5
Item Total Rate / Units (NPR) Amount
Kalika Shree Shree Srijansil Gahate Ni Ma V,
Description Elementary Suryamukhi LSS, Shakhauri, Bahuntipling,
No. School, Babala, Elementary sindhuli sindhuli Quantity Unit In Fig. In Words (NPR)
Sindhuli School, Sindhuli
1 SITE CLEARANCE
1.1 Site Clearance (to make the bed surface of gabion 1 1 1 1 4.00 L.S
positioning)
2 EARTH WORK
2.2 E/W in excavation for structures in common
soil, lead 50.0 m, lift upto 3.0m, all complete 16 16 11 16 59.00 m³
3 GABION AND STONE WORKS
3.1 Supplying, fabrication, assembling, placing in
position of gabion box consisting of hexagonal
mesh size 100 x100mm, including rolling, cutting,
weaving with 10 SWG wire, binding the gabions
together and tying down the lids with binding wire
12 SWG, all complete.
2x1x1m Box 32 32 22 32 118.00 box
3.2 Supply and Filling stones in gabions, all complete 64 64 44 64 236.00 m³
Page Total :
Total Cost page 1:
Transportation cost page 1
Page 1 Total
BILL OF QUANTITIES
Gabion wall construction for protection of TLC in different districts and locations
Page 2 of 5
Item Total Rate / Units (NPR) Amount
Description Bishnu Pra Vi., Shanka Devi
No. Gorkha Pra. Vi., Gorkha Quantity Unit In Fig. In Words (NPR)
1 SITE CLEARANCE
1.1 Site Clearance (to make the bed surface of gabion 1 1 2.00 L.S
positioning)
2 EARTH WORK
2.2 E/W in excavation for structures in common
soil, lead 50.0 m, lift upto 3.0m, all complete 16 26 42.00 m³
3 GABION AND STONE WORKS
3.1 Supplying, fabrication, assembling, placing in
position of gabion box consisting of hexagonal
mesh size 100 x100mm, including rolling, cutting,
weaving with 10 SWG wire, binding the gabions
together and tying down the lids with binding wire
12 SWG, all complete.
2x1x1m Box 32 52 84.00 box
3.2 Supply and Filling stones in gabions, all complete 64 104 168.00 m³
Page Total :
Total Cost page 2:
Transportation cost page 2
Page 2 Total
BILL OF QUANTITIES
Gabion wall construction for protection of TLC in different districts and locations
Page 3 of 5
Item Dowongpokhari Jankalyan Total Rate / Units (NPR) Amount
Basic School, Samaj Bikash Secondary Shree Janashakti Ganesh Ma Vi,
No. Description Sindhupalchow Pra V, School, PS, Kavre Ganeshthan, Quantity Unit In Fig. In Words (NPR)
k Sindhupalchowk Ghartichap, Nuwakot
Kavre
1 SITE CLEARANCE
1.1 Site Clearance (to make the bed surface of gabion 1 1 1 1 1 5.00 L.S
positioning)
2 EARTH WORK
2.2 E/W in excavation for structures in common
soil, lead 50.0 m, lift upto 3.0m, all complete 16 16 11 16 16 75.00 m³
3 GABION AND STONE WORKS
3.1 Supplying, fabrication, assembling, placing in
position of gabion box consisting of hexagonal
mesh size 100 x100mm, including rolling, cutting,
weaving with 10 SWG wire, binding the gabions
together and tying down the lids with binding wire
12 SWG, all complete.
2x1x1m Box 32 32 22 32 32 150.00 box
3.2 Supply and Filling stones in gabions, all complete 64 64 44 64 64 300.00 m³
Page Total :
Total Cost page 3:
Transportation cost page 3
Page 3 Total
BILL OF QUANTITIES
Gabion wall construction for protection of TLC in different districts and locations
Page 4 of 5
Item Bulungkhani Shree Mahadev Shree Man Devistan Lower Chhiringe Basic Total Rate / Units (NPR) Amount
Description Pra.vi, Bulung, Pra V, Sailung, Mohan sikshya Secondary School,
No. Dolakha Dolakha Sadan pra v, School, Bijulikot,Ramec Quantity Unit In Fig. In Words (NPR)
Dolakha Okhaldhunga hhap.
1 SITE CLEARANCE
1.1 Site Clearance (to make the bed surface of gabion 1 1 1 1 1 5.00 L.S
positioning)
2 EARTH WORK
2.2 E/W in excavation for structures in common
soil, lead 50.0 m, lift upto 3.0m, all complete 11 11 11 16 16 65.00 m³
3 GABION AND STONE WORKS
3.1 Supplying, fabrication, assembling, placing in
position of gabion box consisting of hexagonal
mesh size 100 x100mm, including rolling, cutting,
weaving with 10 SWG wire, binding the gabions
together and tying down the lids with binding wire
12 SWG, all complete.
2x1x1m Box 22 22 22 32 32 130.00 box
3.2 Supply and Filling stones in gabions, all complete 44 44 44 64 64 260.00 m³
Page Total :
Total Cost page 4:
Transportation cost page 4
Page 4 Total