355x Filetype PDF File size 2.13 MB Source: indico.cern.ch
Pipe joining techniques for Phase 2
upgrades high-pressure systems -
Summary report from CERN’s 18th
of May 2018 workshop
JEROME DAGUIN – PAOLO PETAGNA
THANKS TO: GEORG V., FRITZ M., ANTTI O., KAROL R., BART V., PAUL K.R., PIERRE D.,
ALLEN Z., PETER R., HANS P., CHI-MENG L.
25.06.18 JÉRÔME DAGUIN -CERN 1
Outline
CERN’s 1 day workshop
Context of Ph2 upgrades
Leak tightness and reliability
The joining techniques
◦ Brazing techniques
◦ Welding techniques
◦ Fittings
Conclusion
25.06.18 JÉRÔME DAGUIN -CERN 2
CERN’s 1 day
workshop
PIPE JOINING TECHNIQUES FOR PHASE 2 UPGRADES HIGH-
PRESSURE SYSTEMS
25.06.18 JÉRÔME DAGUIN -CERN 3
CERN Workshop –18thof May 2018
“The workshop is intended as an informal and
open discussion on all the aspects of joining
techniques for CO2 cooling system piping,
including fittings, welded joints, brazed joints
and special connections involving electrical
breaking.”
1 full day
8 talks
≈ 60 participants
Mailing list created (contact me if you want to be added)
https://indico.cern.ch/event/721360/overview
25.06.18 JÉRÔME DAGUIN -CERN 4
no reviews yet
Please Login to review.